Manhattan portion of $4.7B water tunnel unveiled - KMSP-TV

Manhattan portion of $4.7B water tunnel unveiled

Posted: Updated:
By JONATHAN LEMIRE
Associated Press

NEW YORK (AP) - A new tunnel to deliver water to portions of New York City is about to start working.

Mayor Michael Bloomberg says the Manhattan section of Water Tunnel 3 is complete. It's one of the largest infrastructure projects in city history.

The tube will provide 350 million gallons of water a day to the borough, easing the strain on the two existing tunnels. They were built in 1917 and 1936 respectively.

Bloomberg officially turned on the 8.5-mile section of tunnel at City Hall Park on Wednesday. He says the drinking water that flows through the new tunnel will not taste different.

Construction on Water Tunnel 3 began in 1970 and has cost $4.7 billion. The entire project, which will reach into Brooklyn and Queens, is slated for completion in 2021.

Copyright 2013 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Powered by WorldNow

KMSP-TV
11358 Viking Drive
Eden Prairie, MN 55344

Phone: (952) 944-9999
Fax: (952) 942-0455

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | New Terms of Service What's new | Ad Choices