Preview of new I-10 and Loop 303 freeway interchange - KMSP-TV

Preview of new I-10 and Loop 303 freeway interchange

Posted: Updated:

The Arizona Department of Transportation is showing one of the elevated ramps that will eventually link I-10 and Loop 303 in Goodyear.

Several elevated ramps will be built throughout the interchange to provide direct connections between freeways.

In addition, Loop 303 will be widened to a six-lane freeway north of I-10 and a new portion of I-10 will be slightly shifted to the north through the area of the interchange.

The $134 million project is expected to be completed in fall 2014.

Powered by WorldNow

KMSP-TV
11358 Viking Drive
Eden Prairie, MN 55344

Phone: (952) 944-9999
Fax: (952) 942-0455

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices